|
Today, 10:39 AM EDT
|
|
|
edit |
7 words added
|
|
Change: Celtic Park | About Celtic | Lennoxtown Celtic Park Construction PlansWhilst initially trying to invest in Celtic Football Club in 1992/93, Fergus McCann turned up at the ground with a
View changes from previous version.
(Word count: 453)
|
|
Mar 12 2008, 9:33 AM EDT
|
|
|
edit |
1 image added
1 image deleted
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 448)
|
|
Jan 11 2008, 10:58 PM EST
|
|
|
edit |
1 image added
1 image deleted
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 448)
|
|
Jan 11 2008, 10:45 PM EST
|
|
|
edit |
2 words added
1 word deleted
|
|
Change: Whilst initially trying to invest in Celtic Football Club in 1992/93, Fergus McCann turned up at the ground with a surveyor and asked for permission to
View changes from previous version.
(Word count: 448)
|
|
Jul 23 2007, 7:09 PM EDT
|
|
|
edit |
2 words added
2 words deleted
|
|
Change: Whilst (initially)Whilstinitially trying to invest in Celtic Football Club in 1992/93, Fergus McCann turned up at the ground with a surveyor and asked for permission
View changes from previous version.
(Word count: 448)
|
|
Oct 25 2006, 6:37 PM EDT
|
|
|
edit |
1 image deleted
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 447)
|
|
Oct 22 2006, 10:25 AM EDT
|
|
|
edit |
1 image added
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 447)
|
|
Oct 2 2006, 11:10 PM EDT
|
|
|
edit |
6 images added
6 images deleted
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 447)
|
|
Sep 15 2006, 9:14 PM EDT
|
|
|
edit |
150 words added
|
|
Change: One small criticism of the design is that the North Stand cantilever is compromised by having the roof supports inside the stadium, leading to a
View changes from previous version.
(Word count: 447)
|
|
Sep 15 2006, 9:02 PM EDT
|
|
|
edit |
32 words added
4 words deleted
|
|
Change: and architects visual renderings are taken from the doneconcept design report produced by Bucknall Austin, Project Management Consultants, in conjunction with Hutter, Jennings & Titchmarsh, Consulting Engineers, and TitchmarshRayner Associates, Chartered Architects, in July 1993. TheyHutter, Jennings & Titchmarsh were consequently awarded the
View changes from previous version.
(Word count: 296)
|
|
Sep 15 2006, 8:54 PM EDT
|
|
|
edit |
1 image added
1 image deleted
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 270)
|
|
Sep 15 2006, 8:53 PM EDT
|
|
|
edit |
13 words added
1 word deleted
|
|
Change: the ground.ground - this suggestion was said by first mooted by The Bunnet himself.These detailed drawings were done by Hutter, Jennings and Titchmarsh in July 1993. They were consequently awarded the actual contract by McCann after he gained overall control of Celtic Football Club in March 1994.
View changes from previous version.
(Word count: 270)
|
|
Aug 13 2006, 10:07 PM EDT
|
|
|
edit |
3 words added
1 word deleted
|
|
Change: Football Club in 1992/93, Fergus McCann turned up at the ground with a surveyor and asked for permission to enter the ground and take measurements. Of course, the old board in charge of the club at the time (of whom he would later overthrow) refused to let him in.Undeterred,
View changes from previous version.
(Word count: 259)
|
|
Aug 13 2006, 10:06 PM EDT
|
|
|
edit |
3 words added
2 words deleted
|
|
Change: at the cemetery side of the ground. These detailed drawings were done by Hutter, Jennings and Titchmarsh in July 1993. They were consequently awarded the actual contract by McCann after he gained control of theCeltic clubFootball Club in March 1994.
View changes from previous version.
(Word count: 257)
|
|
Aug 13 2006, 9:42 PM EDT
|
|
|
edit |
1 word added
1 word deleted
|
|
Change: 'overhang' at the cemetery side of the ground. These detailed drawings were done by Hutter, Jennings and Titchmarsh in July 1993. They consequently were consequently awarded the actual contract by McCann after he gained control of the club in March 1994.
View changes from previous version.
(Word count: 256)
|
|
Aug 13 2006, 9:32 PM EDT
|
|
|
edit |
1 word added
1 word deleted
|
|
Change: drawdrew up plans for the much-needed reconstruction of the ground.Not One Thin Dime...Whilst the finished version isn't an exact match of the original plans, it's close enough. The stands behind
View changes from previous version.
(Word count: 256)
|
|
Aug 13 2006, 9:31 PM EDT
|
|
|
edit |
4 words added
|
|
Change: Not One Thin Dime...Whilst the finished version isn't an exact match of the original plans, it's close enough. The stands behind the goals were to be
View changes from previous version.
(Word count: 256)
|
|
Aug 13 2006, 9:31 PM EDT
|
|
|
edit |
|
|
Change: There were only format changes (bold, italics, etc.) in this version. See this version for details.
(Word count: 252)
|
|
Aug 13 2006, 9:08 PM EDT
|
|
|
edit |
1 word added
|
|
Change: architecturally hinting at the grounds immediate past. The roof cladding was to sit on the top of the roof steelwork. However, this was very much against
View changes from previous version.
(Word count: 252)
|
|
Aug 13 2006, 7:01 PM EDT
|
|
|
edit |
3 words added
2 words deleted
|
|
Change: baulkedbucked this particular trend. That said, practicallyalmost everything else about McCann's original vision was realised in the final design, including the ingenious 'overhang' at the cemetery side of the ground. These detailed drawings were done by Hutter, Jennings and
View changes from previous version.
(Word count: 251)
|